Active Queries
AllRFITQNCR
RFI-2025-0847RFI
Overdue
Clarification required on façade fixing bracket detail at Level 12 transfer zone
Zone C-12 Due 3 days ago → Architect
TQ-2025-0312TQ
Awaiting
Glass specification discrepancy between architectural and structural drawings
DWG-FA-201 Due in 4 days → Structural
RFI-2025-0846RFI
Responded
Sealant colour confirmation for unitised curtain wall system
BIM Element Closed today ← Client
Response received
RFI-0846 closed
3 overdue
Escalation triggered
Avg response: 4.2 days
Last 30 days
XO-RFI

Formal queries with
complete audit trails.

XO-RFI manages RFIs, TQs, and formal project communications. Link queries to drawings and BIM elements, track response deadlines, and maintain legally defensible records.

Drawing linked
BIM connected
Deadline tracking
Legal audit trail
5
Query types
100%
Traceable
Auto
Escalations
Legal
Export format
The Problem

Project communication is a liability

Queries get lost in email threads. Responses aren't tracked. When disputes arise, you can't prove what was agreed or when.

Email Black Hole

RFIs buried in inboxes. No visibility on who's responded, who's waiting, or what's overdue. Critical questions disappear.

No Context

Questions reference "the detail on the drawing" but you can't find which drawing, which revision, or where on the page.

Dispute Risk

When claims arise, you spend weeks reconstructing email chains. No immutable audit trail means no defensible position.

Query Types

Every formal communication, managed

XO-RFI handles all types of formal project queries with consistent workflows and complete traceability.

RFI

Request for Information

Formal questions requiring design team clarification

TQ

Technical Query

Technical clarifications on specifications and details

NCR

Non-Conformance Report

Escalated issues requiring formal resolution

CI

Consultant Instruction

Design changes and instructions from consultants

SI

Site Instruction

On-site directions with formal documentation

Features

Queries with context and accountability

XO-RFI links every question to the exact location, drawing, and BIM element it references - so there's never ambiguity about what's being asked.

Link queries to drawings and models

Every RFI and TQ can be pinned to a specific location on a drawing, a BIM element, or a spatial zone. Recipients see exactly what you're asking about.

  • Drawing markupPin queries to exact locations on drawings
  • BIM element linkingReference specific model elements by GUID
  • Spatial taggingAssociate with zones, floors, and areas
  • Photo evidenceAttach site photos from XO-Capture
app.briexo.com/rfi/RFI-2025-0847
RFI-2025-0847
Façade fixing bracket clarification
Overdue
Question
Please confirm the fixing bracket specification for the transfer zone at Level 12. The current detail shows M12 bolts but structural calcs indicate M16 required.
Assigned To
→ Lead Architect
Due Date
3 days overdue
Cost Impact
Likely
Time Impact
Possible
Linked To
DWG-FA-201
Rev C
BIM Element
Bracket-12-C
Zone C-12
Transfer
3 items linked
Drawing, BIM, Zone

Deadline tracking and auto-escalation

Set response deadlines and let XO-RFI chase for you. Automatic reminders, escalation rules, and clear visibility on what's overdue.

  • Response deadlinesSet due dates based on priority and contract
  • Auto remindersEmail nudges before deadlines hit
  • Escalation rulesNotify managers when queries go overdue
  • Response metricsTrack average response times by party
app.briexo.com/rfi/dashboard
Response Performance
87%
On-time responses
4.2
Avg days to respond
3
Currently overdue
Response by Party
Architect
3.1 days
Structural
4.8 days
MEP
6.2 days
Client
8.7 days
Reminder sent
RFI-0847 due tomorrow
Capabilities

Legally defensible communications

Every action is logged. Every response timestamped. When disputes arise, you have the evidence.

Immutable Audit Trail

Every action logged with timestamp and user

Email Preservation

Capture and store all related email threads

Legal Export

Export complete records in court-ready format

Version Control

Track which drawing revision was referenced

Cost Tracking

Flag cost and time implications on responses

Distribution Lists

Route queries to the right parties automatically

Response Analytics

Track performance by party and query type

XO-Flow Integration

Trigger workflows on submission or response

Integrations

Queries connected to everything

RFIs and TQs link to drawings, models, schedules, and costs - so responses have real impact.

Ready to formalise your project communications?

See how XO-RFI creates accountability and audit trails for every query on your project.