Weekly Timesheet
Week 06 · Project Atlas
Submitted
31.5h
Pending
8.0h
Mon8.0h
Tue8.0h
Wed7.5h
Thu8.0h
Fri0.0h
Facade install · Zone C12
4.5h
QA walkdown · Level 08
3.0h
Timesheet approved
Foreman sign-off complete
Exception flagged
Long shift review needed
XO-Time

Capture hours fast.
Cost labour accurately.

XO-Time is built for construction teams that need field-first time capture, commercial traceability, and approval-ready records without spreadsheet overhead.

Built for daily field use, clear approvals, and payroll-ready reporting across project teams.

Clock in/out + breaks
Cost code allocations
Approval routing
Audit-ready history
Fast
Daily time capture
Clear
Approval status
Accurate
Cost attribution
Ready
Payroll exports
The Problem

Time data breaks before payroll

Field capture, commercial coding, and approvals often sit in disconnected systems. The result is delay, rework, and low confidence in labour cost reporting.

Manual entry friction

Site teams lose time to repetitive entry and rekeying rather than quick capture in context.

Weak cost attribution

Hours are not consistently tied to project and cost code structure, so job costing drifts.

Approval bottlenecks

Missing punch handling and late sign-off cause payroll churn and delayed commercial decisions.

Capabilities

Built for field capture and commercial control

XO-Time helps teams capture hours quickly, approve time clearly, and send accurate records to payroll.

Clock and kiosk capture

Capture start times, breaks, and finish times through worker self-entry or supervised kiosk mode.

Project and cost tracking

Link hours to the right project and cost line so reporting stays accurate.

Crew + office entry

Support worker self-entry, foreman crew entry, and office daily-hours mode in one flow.

Clear manager approvals

Route timesheets through review and sign-off with visible status at each step.

Policy and exception checks

Apply pay-rule and policy checks so missing punches and unusual shifts are flagged before payroll.

Equipment and payroll outputs

Capture labour and equipment usage, then export approved periods in payroll-ready and reporting-ready formats.

Features

Designed around the real time-to-payroll flow

XO-Time supports daily field capture, controlled approvals, and payroll-ready reporting in one connected flow.

Field-first capture with minimal taps

Time capture is organized for active job sites: quick entry, clear context, and immediate status visibility.

  • One-shift contextSingle open shift invariant keeps worker status explicit.
  • Work switchingMove between tasks or cost codes without rebuilding entries.
  • Project-aware selectionOnly valid project/cost options are available at point of entry.
  • Near real-time summariesDaily and weekly rollups stay visible during capture.
app.briexo.com/xo-time/clock
Today · Friday
Citibank Installation · Zone C12
07:30Clock inFAC-312
11:58Break startAuto tracked
12:32Break endAuto tracked
13:10Switch workQA-044
Work code switched
FAC-312 > QA-044

Controlled submit-to-payroll approvals

Approval queues and exceptions are designed to reduce handoff friction between operations, foremen, and payroll teams.

  • Explicit approval stagesForeman and payroll actions are separated and traceable.
  • Exception-first reviewMissing punch and long-shift cases are surfaced before sign-off.
  • Audit attributionEdits and decisions are attributable with reason history.
  • Integrations and exportsApproved periods can be sent to payroll and commercial reporting workflows.
app.briexo.com/xo-time/approvals
Approvals Queue
Submitted
>
Foreman Review
>
Payroll
Exception: Shift exceeded policy threshold · review required
Export ready after final approval
Batch approved
12 shifts moved to payroll

Ready to run XO-Time on your projects?

We can configure XO-Time around your project structure, cost codes, and approval model.