Read Article →Unitised vs stick curtain wall is a cost and programme call that also decides where your façade evidence is made, and what links factory to wall.

The system choice usually gets made in a cost meeting. Unitised or stick: crane time against scaffold time, factory labour against site labour, a programme that wants the building watertight by a date. Then, months into the install, a question arrives that the cost meeting never priced. The client's building safety consultant wants to know what holds a particular panel on the ninth floor of the east elevation, who fixed it, and what was checked before it was closed in. The answer is in your records somewhere. Where it is depends almost entirely on the decision taken in that first meeting.
Nobody regulates the choice between unitised and stick curtain walling. What they look at is the external wall that results, and the information that proves it was built as designed. On a higher-risk building in England, broadly one of at least 18 metres or seven storeys with at least two residential units (and, during design and construction, hospitals and care homes of that height), building work needs building control approval from the Building Safety Regulator before it starts, changes during construction run through a change control process, and the completion certificate application has to be backed by information about what was actually built. That information forms part of the golden thread, which is kept through design and construction and handed over at completion; once the building is occupied, the accountable persons have to keep it accurate and available. Below the threshold the building control route is different, and the underlying question is the same: can you show what is on the wall, and that it matches what was designed, tested and approved?
The two systems answer that question from different places. Briefly, for anyone outside the trade: a stick system is built on site, piece by piece, with mullions fixed to the structure on brackets and transoms fixed between them, then glazing and infill panels installed and sealed in place. A unitised system is assembled and usually glazed in a factory as complete units, each typically a floor high, which are lifted onto brackets at the slab edge and interlock with their neighbours along vertical and horizontal joints. Plenty of jobs sit somewhere between, with panelised or semi-unitised hybrids, and the evidence pattern of a hybrid is a mix of the two below. The building is not asking which you chose. It is asking you to prove the result. But the choice decides where that proof gets made, by whom, and how easily it comes apart.
On a stick system almost all of the build evidence is generated on site, in sequence, and much of it is covered up by the next operation.
On a unitised system a large share of the evidence moves to the factory, and what remains on site is concentrated at the joints and the fixings.
In both cases the test evidence for the system itself sits underneath all of this: the specimen that was tested, and every way the building departs from it. That is its own subject, covered in our post on keeping CWCT test evidence findable.
The two systems break the usual spreadsheet-and-email approach in different ways. On stick, the evidence is real but scattered across time: a bracket inspection sheet in the site cabin, a fire-stopping photo in a WhatsApp group, a hose test result in an email from the supervisor, each describing a location in words that made sense on the day. On unitised, the failure is quieter and harder to recover. The factory may keep a thorough record against unit numbers. The site keeps its own record against elevations and floors. The document that joins them, which unit went where, often lives in an installation tracker spreadsheet maintained by one site engineer, overwritten as units are swapped, damaged or re-sequenced. When that tracker goes, the factory record can be complete and still answer nothing, because nobody can say which record describes the panel on the ninth floor.
The fix is the same principle applied to two different shapes of work: anchor every record to the place on the building it describes, at the moment it is made. For a stick system that means the bracket check, the fire-stopping inspection and the hose test are each captured against elevation, level and grid while the scaffold is still there, so a question about a bay can be answered by going to the bay rather than to an inbox. For a unitised system it means one more step: the unit identifier becomes a recorded link between the factory record and an installed position, captured when the unit is hung rather than reconstructed from the tracker months later. A swapped or replaced unit then changes the record instead of breaking it.
Done that way, the two trails stop being two different filing problems. Both become a record of a building, built as the work happens, that can answer a question about one panel without anyone needing to remember how the job was run.
The BrieXO bundle that covers the site end of this work is FIELD, and it is live today: daily site records and ITP sign-offs, governed photo evidence, operative competence records, record-linked communication and programme visibility, captured as the work happens and linked to the location on the building they describe, through the spatial spine every BrieXO tenant runs on. It does not design or test a curtain wall, and it does not decide whether a system or a deviation is acceptable: those are judgements for the competent people making them. Factory production records stay with the factory; the unit identifier you agree with them is what connects those records to the installed position. It supports, and does not certify, compliance. It supports your golden-thread and façade evidence duties; it doesn't discharge them. The façade-specific picture is on our façade contractors page.
Related reading:golden-thread duties by trade, rebuilding a golden thread during cladding remediation, and the as-built record at Gateway 3 handover.
George Sfica is a senior design manager at a specialist façade contractor, with 23 years in manufacturing and construction, eleven of them in façades and external envelopes, spanning fabrication, installation and design management, an MSc in Façade Engineering and an IFE Level 2 Certificate in Passive Fire Protection. He is the founder of BrieXO.

George Sfica is the founder of BrieXO. A façade engineer with 23 years in manufacturing and construction, eleven of them in façades and external envelopes, he has spent his career identifying workflow gaps and building the systems to close them: from quote automation at metal manufacturing plants in Italy to live dashboards and enterprise platform rollouts at leading UK facade contractors. BrieXO is the platform version of that pattern.
We serve global construction teams with region-specific compliance knowledge. Use these guides to align BIM coordination and audit trails across UK/EU requirements, US workflows, and APAC/ANZ delivery standards.

How building integrated photovoltaics work, the UK policy and fire-safety context, honest cost realities and the records BIPV projects need.
Read Article →UK construction compliance software guide: Building Safety Act duties, golden thread records, competence evidence, CDM 2015 and what to evaluate.
Read Article →Get insights on construction technology trends, field operations, and delivery workflows.